Project Description

Scope of Work: Replacement of Large Overhead Glazed Unit
Mode of Access: Rope Access, Crane with Suction Lifter, Roof Access Ladder System, Road Closure
Location: Central London
Team Size: 9
Duration: 1 Shift

A prime office location in central London contacted us requiring a large overhead glass unit to be replaced. The office location resulted in a combination of access methods to be used to reach to the damaged unit. Due to the site’s height, the projects team utilised a mobile tower crane with suction lifter to manoeuvre the damaged unit out of the opening and the new unit into place.