Project Description
Scope of Work: Glazing Demolition Works
Mode of Access: Abseil, MEWP, City Mobile Crane
Location: Central London
Team Size: 10
Duration: 12 Weeks
Working for a large main contractor, GRA conducted the required controlled removal of multiple glazed concourses to one of London’s busiest train stations.
Conducting the multiple glass removals, our rope access operatives commenced with the removal of the bracing tie roads and transported down to ground level for disposal. Utilising the city crane, our operatives connected the suction lifter to the external face of the glazing and removed the required glazing panels.
These removal works are the starting part of the first phase of a multi-million-pound refurbishment project to the station.