Project Description
Scope of Work: 10h Floor Glass Replacement
Mode of Access: Abseil
Location: Birmingham
Team Size: 6
Duration: 1 Shift
As a result of the high level and difficult to access location, our client required a glazing abseil team to conduct the DGU replacement.
To commence with the works our IRATA trained operatives removed the damaged unit and passed through to our operatives inside the building. After removing the damaged unit, our team cleaned the aperture and prepped the opening ready for the new unit to be installed.
After successful the installation of the new unit, our team completed the works with the installation of weather seals and clean down of the new unit.